W2W supplied and installed Optima partitions, doors and atrium glazing over 3 floors of the office
W2W supplied and installed butt jointed 19.5 Heat Soak Tested Low Iron Toughened Laminate glass, 40 dB (Rw) with a 0.74 kN/m line load. We also installed 2nr Edge Affinity S/G doors and Optima 117+ screens with 12mm Toughened glass 33 dB (Rw).
The building is now LEED Platinum certified which was a great achievement as sustainability was a key factor for the Oracle Direct EMEA Cloud Sales Hub.